INITIAL PHASES
In the initial phases of Scoping, Discovery, and Analysis, Robocoder Corporation's solution analysts work closely with
business users to define business processes for automation. After storyboarding and sometimes wire framing, rigorous test cases
are developed ahead for the subsequent prototype, so that the system can be designed to satisfy these test cases and consequently meet user requirements.
The focus here is to produce implementation-ready software the first time. When clients invest more time up front to get
the design right, the implementation phase is incredibly fast, a matter of days and weeks rather than months.
SCOPING
In this first step, all the elements of the task are identified, such as stakeholders, locations, business performance metrics,
business and technical constraints and risks, and so on. Business requirements, organizational infrastructure, and resources are
also determined. From newly defined alternatives, the analysts select a solution. At the end of this phase deliverables may include:
- Project Description or Charter
- Business Requirements Draft
- Estimate
DISCOVERY
In Discovery, the analysts first divide the job into the four components: Workflow, Rules, Data, and Technology.
These will flow through the subsequent Analysis and Design stages. Robocoder Corporation staff examine existing
systems and data; they begin determining what the rules need to be (rule mining); and they document rules and workflow
diagrams. They then move on to the conceptual data model and data quality assessment. Finally, technological requirements
are determined and a tiered technology diagram is generated. At the end of this phase deliverables may include:
- Business Requirements Signed-off
- Conceptual Solution Prepared
- Storyboard Verified
ANALYSIS
This is where the analysts get into the application process flow, solidify rule methodologies, and complete mining, analysis,
and optimization of rules. On Rintagi anti-aging App Platform, each business rule can be classified as one of Constraint, Computation,
Inference or Action Enabler, and can be managed independently. Validation workshops are held with the business users to make
sure the business rules are correct, and then the rules are finalized. Next, analysts complete a data source quality assessment,
and determine history and archive requirements. A logical data model is developed and integrated with enterprise data. Entity
relationship diagrams are created, data volumes are estimated and conversion specifications are developed. Finally, the analysts
identify needed interfaces between technologies and conduct a Proof of Concept. At the end of this phase deliverables may include:
- Conceptual Solution Signed-off
- Wireframe Verified
DESIGN AND IMPLEMENTATION
Now that the specifications are known, prototype can begin. Each prototype can turn into a production system in seconds.
Rintagi can generate millions of lines of code in seconds, so this phase will proceed rapidly.
Content management is automatically included. The client's system administrator can control security and access
by assigning display and edit access levels, down to each column and row of data if need be. Moreover, change can
be done quickly and accurately because all codes are either generated or managed and impact analysis can easily be
performed prior to making changes.
The design process is started by confirming how business events will be divided into system events. User guides and
use-case descriptions are generated, and the workflow processes are designed. Rule design and classification is completed
and double-checked, and rule deliverables are produced. After the databases and their utilities are confirmed, physical
data conversion specifications and programs are created. Now analysts can install the application, produce the technology
support guide and user support model, and train technical support personnel.
After all this careful preparation, implementation takes only days or weeks, rather than months. At the end of this phase expect deliverables:
- Prototype Verified
- System Generated
- Application ready for Integrated and Acceptance Testing
TESTING
Iterative and incremental testing has two purposes: to make sure that user requirements are being met and that the elements
of the program are working properly. There are typically few bugs during this stage, so all the benefits of the new
software are quickly realized, such as business continuity, reduced workload, and increased accuracy and flexibility.
System Integrated Testing is satisfied prior to deployment to users for User Acceptance Testing. At the end of this phase
expect deliverables:
- System Signed-off
- Deployment Package ready for Production
AND IT’S DONE — ON TIME AND WITHIN BUDGET
The new system can be up and running just days or weeks after completion of the Initial Phases.
We deliver and you can see what other clients are saying about us on our testimonial page.